First Friday Approaches
Wednesday April 28th 2010, 11:18 am
Filed under: Flexwood
David Koen works on the final fit before he glues his alder chair.

David Koen works on the final fit before he glues his alder chair.

The students are in the final two weeks of finishing projects for the Flexwood First Friday at Moose Run Metal Works. We have one bench that is the little sister of the Three Sisters Bench theme. They are made from  a yellow cedar  log that dirfted north from the Pacific Northwest and entered Kachmak Bay to be reclaimed as furniture. We also have three arm chairs that are distinctly different different in the types of wood used, but similar in design.  The final touches this week include gluing, sanding, and applying finishing.  Our finish is 1/3 paint thinner, 1/3 linseed oil, and 1/3 polyurethane. We apply three coats and finally, we apply a wax to surfaces that will recieve wear. These finishes can be reapplied over time.



Hoop House Is Up
Tuesday April 27th 2010, 9:01 am
Filed under: Spring Greens
Hoop house construction on a sunny day.

Hoop house construction on a sunny day.

The hoop house is up as of April 26th, 2010. The temperature was up to 76 degrees yesterday and it was n38 degrees this morning. We will monitor through out the day. Soil temperatures are at 45 degrees. We will also be putting our starts in the hoop house to harden off. Much thanks goes to the biology students for helping out and Richard Munoz for putting in the extra effort leveling out the walls.



Hoop House Construction
Tuesday April 06th 2010, 8:58 am
Filed under: Spring Greens
Alex Moore and Richard Munoz stapling the visqueen to the end of the hoop house. Alex Moore and Richard Munoz stapling the visqueen to the end of the hoop house.
Hoophouse II The door is cut out of the hoop house. Tiffany supervises Alex in how to staple.

The week after Easter Homer Flex High School students completed the front and back of the hoop house. Our design for the green house came from The Garden Door. In these pictures Tiffany Tesar, Alex Moore, and Richard Munoz finish off putting visqueen on the front and back. At this point, we are only putting in a front door, with the option of making a vent for the back later.